Productos

Agente taponador temporal

Agente taponador temporal

Whatspp:+86 15895374676
Correo electrónico:gaoxinhq@126.com

Detalle

During the drilling process, the plugging agent is added to the drilling fluid together. The plugging agent will block the wellbore or cracks, prevent drilling fluid from infiltrating the formation and causing significant losses, prevent oil and gas well collapse, and prevent toxic gas leakage. After completion, EPLUG will be degraded into carbon dioxide and water. Oil/gas will flow out of the well, which will also increase the oil recovery rate.

Agente taponador temporal
Temporary Plugging Agent1
Temporary Plugging Agent2
Temporary Plugging Agent3

Productos relacionados

BARRERA DE ARENA

BARRERA DE ARENA

Red antipájaros de PLA

Red antipájaros de PLA

Barreras de arena sostenibles - Material PLA para soluciones 0 residuos plásticos

Barreras de arena sostenibles - Material PLA para soluciones 0 residuos plásticos

Cinta de injertar Eco Clear

Cinta de injertar Eco Clear

Bolsas de PLA para barreras de arena

Bolsas de PLA para barreras de arena

PLA Taponador temporal para perforación de pozos petrolíferos

PLA Taponador temporal para perforación de pozos petrolíferos

Póngase en contacto

Envíe su mensaje